Home › South Salt Lake, UT › EV Chargers in South Salt Lake

EV Charger Installation in South Salt Lake, UT

A Level 2 EV charger in South Salt Lake is a planned electrical project: a load calculation on a 1980s-era or mid-century panel, a path that often has to fit a small-lot driveway rather than a wide west-valley garage, a city permit, and an inspection that can be scheduled only on the city's inspection line. Paulsen Power LLC, a licensed electrical contractor based in West Jordan about nine miles south, starts with that math, then sizes a 30, 50, or 100 amp, 240-volt circuit to the charger and to the building. Call (385) 403-1403, Monday through Friday, 8:00 AM to 5:00 PM. We will not hang a charger on a leftover breaker and hope the service holds.

Paulsen Power LLC · Utah licensed electrical contractor · Owner Jeremy Paulsen · Monday–Friday, 8:00 AM–5:00 PM · Service-area business based in West Jordan, UT (no storefront address published) · About 9 miles to South Salt Lake · (385) 403-1403 · [email protected]

Why does a South Salt Lake charger start with a load calculation?

The charger is the easy part to picture. The part that decides whether the building is ready is the service and the circuit design. A Level 2 charger is a continuous load. Adding one to a 100-amp or already-busy panel — common in a city whose ACS 2024 5-year median year built is 1986 — is often what forces a panel or service upgrade. Air-conditioning load belongs in that calculation too; the official Salt Lake City climate station averages about 48 days a year at 90°F or hotter.

We look at the panel, the meter, the path to the parking spot, and what else you plan to add. You get a written scope that names the circuit size, hardwired versus a receptacle, and whether the service has to change first. If the math is short, we plan the upgrade before the charger is installed, or as a combined project when that is the cleaner path.

A regular dryer outlet is not a long-term charger plan. A dedicated, permitted circuit is the right project: the correct breaker, conductor size, and a location that is not competing with a dryer.

What charger circuits do you install, and how does placement work on a small South Salt Lake lot?

Most homeowners want Level 2 charging at home (a 240-volt circuit). The right amp rating depends on the charger, how fast you need to fill the battery, and what the house can spare:

  • A 30 amp circuit — a modest Level 2 circuit when the charger and the load calculation support it.
  • A 50 amp circuit — a common size for many home chargers, including a NEMA receptacle or a hardwired unit.
  • A 100 amp circuit — for higher-capacity equipment when the service and the run can support it.

We will also settle hardwired versus a receptacle, indoor versus outdoor placement, the disconnect the equipment or the city wants, and whether the run is surface, conduit, or concealed. If you have not bought the unit yet, we can help you match the circuit to a charger instead of buying a unit the panel cannot feed. If you already own the unit, send the model before the visit.

Placement is the distinctive constraint in this city. Small residential lots along State Street, 2100 South, I-15, and the TRAX and S-Line corridors often mean a short driveway, a shared parking pad, an alley, or a garage that is tighter than a Daybreak or Herriman two-car bay. The run may have to turn a tight exterior corner, cross a short underground stretch, or land on an outdoor-rated unit because there is no interior wall where you park. We measure the route. We do not guess a wide-garage scope onto a tight inner-ring lot.

Tell us if solar, a battery, or a standby generator is in the plan. Those change how load and transfer equipment are designed.

If the project is in a multifamily or commercial building rather than a single-family house, the circuit, the disconnect, the permit, and any utility incentive are a different conversation. We will look at that building case by case rather than copy a house-garage design onto a suite.

How do South Salt Lake permits and Rocky Mountain Power work for a charger?

We apply through the city's building-permit process. The official apply page is sslc.gov/640/Apply-for-a-Building-Permit. Applications go through the city's application portal. Community Development is at City Hall, 220 East Morris Avenue; permit questions can be directed to 801-483-6063, extension 2.

Inspections are scheduled only on the inspection line. The official Building Inspections handout (revised April 24, 2025) states that requests made by email, in a verbal conversation, or on staff voicemail will not be processed. Call 801-483-6032 before 3:00 PM to be considered for the next business day. Scheduling may take up to three business days. You choose an AM window (8:30 AM–12:00 PM) or a PM window (12:00–3:30 PM) and must provide the time window, permit number, address and project name, contact, and inspection type. The permit must be posted, approved plans must be on site, and the job must be ready before the request is made. We make that call.

The utility is Rocky Mountain Power. South Salt Lake is not a municipal-power city. We will not assume a residential charger-purchase rebate is available. Program rules change by tariff year and should be confirmed on a live Rocky Mountain Power page for that account. Wattsmart Drive, where it applies, is a bill-credit program for enrolled drivers who allow managed charging, not money off the installation. Commercial or multifamily charger incentives, if you have that kind of building, are a different program and should be checked case by case.

Work follows the 2023 National Electrical Code as amended by Utah. AFCI is not required in Utah. Official design-criteria numbers were not fetched; ground snow load is looked up by address on the USU map, and frost depth of 30 inches is the regional default until a published city sheet says otherwise.

How does South Salt Lake's housing mix change who a charger project is for?

The ACS 2024 5-year estimates count 10,940 households, with only about 38 percent owner-occupied. That is a renter-heavy, mixed industrial-residential city, not a nearly all-owner suburb. A home charger circuit is usually an owner-occupied house or a property owner authorizing work on a single-family lot or a designated parking space. We will not pretend every apartment or duplex in South Salt Lake can take a driveway pedestal the way a west-valley garage can. If you are a renter, the property owner has to be part of the permit and the scope.

In the owner-occupied pockets, mid-century and 1970s–1990s houses are where capacity questions show up first. Knob-and-tube is possible only in the oldest pockets and has to be confirmed, not assumed. Mid-century panel brands have to be identified at the equipment. The Utah State Prison site redevelopment sits in Salt Lake City, not in South Salt Lake, and we will not describe charger demand as if that project were inside this city.

Why add whole-home surge protection with a South Salt Lake charger?

A Level 2 charger is sensitive electronics on a dedicated 240-volt circuit. A nearby strike or a switching transient — including restoration after a metro outage such as the March 1–3, 2024 Rocky Mountain Power storm — can take the charger out along with a furnace board and a refrigerator. The Insurance Information Institute, using State Farm data, reported that the average U.S. lightning homeowners claim was $26,616 in 2025. A typical Level 2 charger unit itself is often $400 to $1,500 to replace.

A whole-home surge protector at the panel greatly reduces damage to hardwired equipment. It is not a 100 percent guarantee against a direct strike — ESFI states that no surge protection device can handle a direct lightning strike — so we also recommend point-of-use strips on TVs and computers. Utah does not require the panel device. If we are already at your panel for the charger, or for a service upgrade with the charger, that is the cleanest time to install it.

South Salt Lake EV-charger FAQs

Do I need a 200-amp panel to charge at home in South Salt Lake?

Not always. A load calculation on a lightly loaded 150-amp or even a 100- or 125-amp service sometimes shows enough room for a 30 or 50 amp charger. In a 1986-median city, the honest answer is often that a panel or service upgrade should come first or in the same project.

How is the inspection scheduled?

Call the inspection line at 801-483-6032 before 3:00 PM. The city will not process email or voicemail requests. Scheduling may take up to three business days. Paulsen Power LLC makes that call.

Is there a residential charger rebate I should count on?

Do not count on one in the proposal until it is confirmed on a live Rocky Mountain Power page for that account. We will not invent a dollar amount. Managed-charging bill credits, where they apply, are a separate program from installation cost.

Can you install the charger I already bought?

Usually yes, if we can still size and protect the circuit to the manufacturer's instructions and the code. Send the model before the visit.

I rent my place. Can you still install a charger?

Only with the property owner's authorization, because the permit and the equipment attach to the building. South Salt Lake is a renter-heavy city; we will not skip that step.

Is a dryer outlet good enough?

It is not the right long-term project. A dedicated, permitted charger circuit uses the correct breaker and conductor size and does not compete with a dryer.

Should I add whole-home surge protection with the charger?

Yes. A charger is one of the boards a surge can destroy. The device is not a 100 percent guarantee against a direct strike, and Utah code does not require it.

Are you based in South Salt Lake, and what are your hours?

No. Paulsen Power LLC is based in West Jordan, about nine miles away. Hours are Monday through Friday, 8:00 AM to 5:00 PM. Call (385) 403-1403.

About the contractor

Jeremy Paulsen owns Paulsen Power LLC, a licensed electrical contractor based in West Jordan, Utah. He still walks the job, writes the scope, and meets the inspector. More on the About page.

Request an estimate

Ready to plan a Level 2 charger circuit that fits your South Salt Lake panel and your parking? Call (385) 403-1403 or request an estimate. Monday–Friday, 8:00 AM–5:00 PM. Paulsen Power LLC serves South Salt Lake and homes within about 50 miles from our West Jordan base. Chat with us using the chat bubble on this page.

Call (385) 403-1403

Electrical contractor

West Jordan, UT

(385) 403-1403

[email protected]

Monday–Friday, 8:00 AM–5:00 PM

Serving homes within about 50 miles of West Jordan, UT